Masking tape, magnolia and steep boards!

11th May 2010

Well its business as usual here at the wall/building site, loads more work is being done and the boys are showing no sign of slowing down, as long as the coffee is flowing and jam on toast is in abundance. 

We are getting alot more painting done and doing a lot of experimenting with different tester pots (there is a fine balance between funky and disgusting - lets hope we get it right!)

Jamie is still working away in the big cave, playing with different angles and features and generally making it look really cool, whilst the rest of the guys are making some super steep training boards to be coated in Beastmaker holds.

We should be receiving our first batch of holds from Entreprise tomorrow so we are looking forward to unwrapping them (its a bit like christmas!)

Keep a look out for special opening offers which will be coming very soon!

Add a comment

* required field